Fill the Garden Bed Mold with Concrete
Fill Mold – position the wheelbarrow close to the working surface.

Shovel in the wet concrete mix filling the mold about half way.

Shake the mold a few times to settle the mix into all corners.


Continue to fill the form level to the top. Do not overfill.

Settle Concrete – Tap the workbench with a rubber mallet around the mold (and under if possible) to fully settle the concrete and help bubbles come to the surface.

You can also use a number of power tools to vibrate the workbench to help with this.

A reciprocating saw without the blade or an orbital sander will vibrate the work surface so that trapped bubbles in the concrete come to the surface.

Cover Mold – after troweling the surface smooth, cover with plastic. This prevents drying too quickly. I like to use a thick plastic like vapor barrier available at building supply stores.

Wait 6 Hours – leave the concrete for at least 6 hours to solidify.
(Disclaimer: As an Amazon Associate I earn from qualifying purchases. Thank you for helping to support my content this way. )
Remove Pipes – insert a nail into the small hole at the end of a pipe.

Pull and gently twist the pipe back and forth to help free it from the concrete.

Clean the pipes with a soft dry cloth.

Alternatively, gently tap the end of the pipe with a rubber mallet first if it is stuck.

Tapping the pipes with any hard surface may distort and/or enlarge the end and make it more difficult to remove. Be gentle if you need to tap the pipes free and only use a rubber mallet.